10/06/2026
नेपाल राजपत्र अपडेट: सरकारद्वारा २५ आवश्यक सेवा क्षेत्रमा हड्ताल निषेध गर्दै सूचना प्रकाशन (२०८३ जेठ २५)
PANA Academy is a Pioneer Institute for Lok Sewa Preparation classes of Engineering (Civil 5th and 7th)
9851342670,9851420233, 9808100083
10/06/2026
नेपाल राजपत्र अपडेट: सरकारद्वारा २५ आवश्यक सेवा क्षेत्रमा हड्ताल निषेध गर्दै सूचना प्रकाशन (२०८३ जेठ २५)
07/06/2026
🎉 Heartiest Congratulations to Er. Sagar Bohara! 🎉
We are proud to celebrate your remarkable achievement of securing the position of 7th Level Civil Engineer in Sudurpashchim Province Government Service.
Your dedication, hard work, and perseverance have turned your dreams into reality. From a determined aspirant to a successful government officer, your journey is truly inspiring.
The entire PANA Academy Family wishes you continued success and excellence in your professional career.
🌟 Your Success, Our Pride! 🌟
📍 Location: Maitighar, Kathmandu
📞 Contact Us: 9851420233 /9851342670
05/06/2026
सुदूरपश्चिम लोक सेवा आयोग
विज्ञापन नं. ५६३-५६८/०८१-८२ अनुसार प्रदेश इञ्जि सेवा, सिभिल समूह, जनरल/ हाइवे/ स्यानिटरी/ इरिगेसन/हाइड्रोपावर उपसमूह, सातौं तह, इञ्जिनियर पदको सिफारिस सम्बन्धि सूचना। हार्दिक बधाई तथा शुभकामना
04/06/2026
लोक सेवा आयोग, केन्द्रीय कार्यालयको बिज्ञापन नं १७२४४-१७२४९/०८२-८३ (खुला तथा समावेशी), इञ्जि. सेवा, सिभिल समूह, जनरल/हाइवे/ स्यानिटरी/इरिगेशन/हाइड्रोपावर उपसमूह, रा.प.तृतीय श्रेणी, इञ्जिनियर पदको लिखित नतिजा
28/05/2026
बकर ईदको हार्दिक सुभकामना !
27/05/2026
२०८३ जेठ १३ गते - गोरखापत्र, ज्ञानसागर लोकसेवा तयारी सामग्री ।
#𝐥𝐨𝐤𝐬𝐞𝐰𝐚𝐩𝐫𝐞𝐩𝐚𝐫𝐚𝐭𝐢𝐨𝐧
26/05/2026
विज्ञापन नं. ५०३५-५०३६/२०८२-८३ (खुला तथा समावेशी) स्थानीय स्वास्थ्य सेवा, रेडियोग्राफी समूह, पाँचौ तह, रेडियोग्राफर पदको लिखित परीक्षाको नतिजा
25/05/2026
लुम्बिनी २०८३-०२-१० Second Paper Civil 7th PSC
Qn. What types of environmental study are conducted in Nepal? How do you identify the types of environmental study for energy sector projects?
Ans:-
1st Part:
Environmental study or assessment is mandatory for every development project in Nepal. Currently, Environment Protection Act, 2076 and Environment Protection Regulations, 2077 are in existence for the conduction of environmental study in Nepal. Many projects are implemented every year by government, private sector and public sector. All of them do not need to go through EA process. Screening can be defined as preliminary activity undertaken to classify level of environmental study that requires for given proposals. There are three level of environmental study as per EPA2076/EPR2077 of Nepal, they are Brief Environmental Study (BES), Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA).
According to Rule 3 (Sub Rule 1) of the Environment Protection Regulations, 2020, Brief Environmental Study, BES should be carried out by the Proponent for the Proposals mentioned in the Schedule-1, Initial Environment Examination, IEE should be carried out by the Proponent for the Proposals mentioned in the Schedule-2, and Environmental Impact Assessment, EIA should be carried out by the Proponent for the Proposals mentioned in the Schedule-3 based on the nature and scale of the Proposals.
2nd Part: Under EPR 2020 Section 6 Energy, Water Resources, and Irrigation Sector of Schedule 1, 2 and 3 environmental study for energy sector projects can be discussed as:
Brief Environmental Study (BES)
i. Use of forest land for power transmission lines up to 66 kV.
ii. Generation of electricity from magnetic energy.
iii. Use of forest land for establishing hydrological and meteorological measurement centers or weather radar installations.
iv. Construction of lift irrigation projects covering up to 100 hectares.
Initial Environmental Examination (IEE)
i. Construction of electricity transmission lines with a capacity of 132 kV or higher.
ii. Construction of a new outdoor substation by tapping from an existing electricity transmission line of 220 kV or higher capacity.
iii. Construction of hydropower generation projects with a capacity ranging from 1 MW to 50 MW.
iv. Operation of electricity generation projects using petroleum or gas with a capacity ranging from 1 MW to 5 MW.
UNDER Renewable Energy Sector
v. Operation of solar energy-based electricity generation projects with a capacity ranging from 1 MW to 10 MW.
vi. Operation of wind energy-based electricity generation projects with a capacity ranging from 1 MW to 10 MW.
Environmental Impact Assessment, (EIA)
i. Construction of a multipurpose reservoir.
ii. Operation of coal-based or nuclear power generation projects.
iii. Construction of hydropower generation projects with a capacity exceeding 50 MW.
iv. Operation of electricity generation projects using petroleum or gas with a capacity exceeding 5 MW.
UNDER Renewable Energy Sector
v. Operation of solar energy-based electricity generation projects with a capacity exceeding 50 MW in hilly regions and exceeding 40 MW in the Terai region
vi. Operation of wind energy-based electricity generation projects with a capacity exceeding 10 MW.
बसन्त लेखक
23/05/2026
Yasto Pani hudo रैछ है!
23/05/2026
𝐃𝐚𝐭𝐞: 𝟐𝟎𝟖𝟐/𝟎𝟐/𝟎𝟗
𝟕𝐭𝐡 𝐋𝐞𝐯𝐞𝐥 𝐂𝐢𝐯𝐢𝐥 𝐄𝐧𝐠𝐢𝐧𝐞𝐞𝐫𝐢𝐧𝐠 𝐋𝐨𝐤𝐬𝐞𝐰𝐚 𝐌𝐨𝐜𝐤 𝐓𝐞𝐬𝐭
𝐀𝐧𝐬𝐰𝐞𝐫 𝐊𝐞𝐲
| Monday | 05:30 - 20:00 |
| Tuesday | 05:30 - 20:00 |
| Wednesday | 05:30 - 20:00 |
| Thursday | 05:30 - 20:00 |
| Friday | 05:30 - 20:00 |
| Saturday | 08:00 - 19:00 |
| Sunday | 05:30 - 20:00 |