13/01/2017
Hydro Magus has been entrusted by KSEB with the construction of Upper Kallar Hydroelectric Project on EPC basis. The work on this project commenced on 09 December, 2016 with a ceremonial prayer session followed by conducting the first blasting for boring out the Tunnel in the hill. A few shots captured at this project are being uploaded for viewing. A video of the first blasting can also be viewed here. Hydro Magus team of Engineers can be seen directing and supervising the project work.
04/01/2017
Hydro Magus accomplished the er****on of the draft tube assembly of Tiga Hydro Project located in Kano, Nigeria this month. Other construction activities are in full swing of progress at site as seen from these snap shots captured at site.
11/09/2016
Hydro Magus has been awarded the Turnkey contract for ETC ex*****on of entire Hydro-Mechanical Equipment and the Electro-Mechanical Equipment of Tiga Hydroelectric Project in Nigeria. The project comprises of one unit each of 8MW vertical Kaplan & 2MW Horizontal ‘S-Type’ located in the state of Kano, Nigeria. The ex*****on work at this project site is commencing by mid-September, 2016.
06/09/2016
Hydro Magus has secured EPC contract for construction of Upper Kallar Hydroelectric Project in Kerala, India. The ex*****on of the project has been started at the project site that involves complete civil works including construction of Weir, Reservoir pond, Tunneling, Power Channel, Forebay, Penstock Anchor Blocks, Power House, Tail Race & channel, Access Road, etc.; Hydro-Mechanical works including supply & er****on of Penstock, Intake/ Draft Tube Gate, Trash Rack, etc.; and Electro-Mechanical works including supply/er****on/ commissioning of Turbine, Generator, Transformers, Switchyard, associated auxiliaries and Balance of Plant, etc.
02/07/2016
A few random pics captured during the revamping of Generating Unit No.1 at Umiam Stage-3 Hydro Project. Happy viewing !!!
19/06/2016
Our Sh. Arbind Koul, CEO & Director in a meeting with dignitaries of Meghalaya Power Generation Corporation Ltd. including Mr. P. Barkos Oflyn Warjri, CMD & Chief Secretary (Meghalaya State); Mr. S. Eslong, Director (Generation), Mr. S. J. Laloo, Chief Engineer, Mr. Lino Shilla, SE, Mr. Manoj Kumpawat, etc. etc. after successful completion of the replacement of 30 MW Generator Stator & Rotor of Unit-1 at Umiam Stg-III Hydro Power Station by Hydro Magus.
11/06/2016
A glimpse of the Hydro Magus Pvt. Ltd. office established in Vancouver, BC, Canada last year. This office can be contacted at:
Hydro Magus Pvt. Ltd.
Suite-250; 241-1160th Street
Surrey, British Columbia, Canada; Zip: V3S 0C8
Tell: +1-778-371-3698
11/06/2016
A new office was established for Hydro Magus in in Kathmandu, Nepal. Puja ceremony on the office inauguration was organised by the Hydro Magus employees who visited Kathmandu for establishing the office.
11/06/2016
Last month, Hydro Magus secured a contract for Renovation & Modernisation of 87 years old Sundarijal Hydro Plant in Nepal. The work involves replacement of all equipments in the Power House apart from upgradation of Civil & Hydro-Mechanical components on EPC basis. Here are a few snaps from the contract signing meeting.
10/06/2016
Recently our Sh. Jitendra Kumar, MD and Sh. Ajay Kumar, Director had a meeting with Mr. Top Bahadur Rayamajhi, the Dy. Prime Minister, of Nepal regarding efforts for augmentation of Electric energy in Nepal. A photo capture after this important meeting at Kathmandu, Nepal.
19/03/2015
Last week, we had a delegation from Litostroj Power, Slovenia including Mr. Matjaz Lampe & Mr. Jaroslav Zacek visiting our company premises and our upcoming manufacturing facility. A full day session of presentations and meetings were held in a positively charged mood. Sharing a few snap shots captured during the meetings.